Investment in Gansu in different historical periods Project Feasibility Study Report The specific contents and requirements are also different. According to the notice issued by the General Office of the National Planning Commission on January 4, 2002 on the publication of the Guidelines for Feasibility Study of Investment Projects (Trial Version), the main contents and requirements of the feasibility study of investment projects are specified as follows:
In general, the feasibility study report of an investment project should include the following contents:
1、 The reasons and objectives of the project construction mainly refer to the reasons, expected objectives and basic conditions of the project construction.
2、 Market forecast, including market status survey, product supply and demand forecast, price forecast, competitiveness analysis, and market risk analysis.
3、 Resource condition evaluation, including the basic requirements of resource development and utilization and resource evaluation.
4、 The construction scale scheme and product scheme, including the construction scale, product scheme and its scheme, must be in accordance with.
5、 Site selection.
6、 Technical scheme, equipment scheme and engineering scheme.
7、 Raw material and fuel supply.
8、 General layout, transportation and public auxiliary works.
9、 Environmental impact assessment.
10、 Labor safety, health and fire control.
11、 Organization and human resources allocation.
12、 Project implementation progress.
13、 Investment estimation.
14、 Financing plan.
15、 Financial evaluation.
16、 National economic evaluation.
17、 Social evaluation.
18、 Risk analysis.
19、 Research conclusions and suggestions.
For different industries and projects, the requirements for the contents of the feasibility study are also different. Different requirements are set according to the specific situation, roughly as follows:
(1) The feasibility study report shall be complete in content, clear in conclusion, accurate in data and sufficient in argument, so as to meet the needs of the decision-makers in making plans and projects.
(2) The planning and policy background of the project requires comprehensive demonstration and reliable conclusions.
(3) Market capacity and competitiveness analysis requires adequate investigation, appropriate analysis methods and reliable prediction.
(4) The specifications and parameters of the main equipment selected in the report should meet the requirements of pre ordering, and the data of the imported technical equipment should meet the requirements of contract negotiation.
(5) The main engineering technical data identified in the report should meet Preliminary design of the project Requirements.