Here are the choices Gansu Feasibility Study Report Write on behalf of the company's precautions
1. Inadequate basis
There is no national and regional or industrial long-term plan, no national industrial policy, no Project Proposal And its approval documents; There is no necessary resource report for large and medium-sized backbone projects, and there is no national approved mineral resource report for projects that need to use mineral resources; In the investment estimation, there is no consultation price information of main equipment, and there is no corresponding quota and standard of project cost; In economic evaluation, some self determined financial three rates and parameters are adopted at will.
2. Incomplete content
The so-called incomplete content is the lack of chapters that should be set up, such as some feasibility study reports, no energy saving chapters, some no environmental protection chapters, some no construction schedule, some no scheme comparison and selection and discussion of recommended schemes in the design scheme, especially no risk analysis in the relevant chapters.
3. Insufficient depth
The so-called lack of depth means that all the chapters to be written have been written, but the research is not thorough, the argument is not sufficient, the discussion is not detailed, the qualitative description is too much, and the quantitative calculation is poor. For example, some lack the principles for determining the production scale and the calculation process, some lack the principles for determining the design scheme, and some lack the calculation methods for the main production equipment, Some of the energy conservation chapters only describe it in a general way, lacking specific energy conservation measures and indicators, while some of the environmental protection chapters still adopt obsolete standards, lacking specific environmental protection measures; In economic evaluation, the source of basic data is not investigated, studied, and its reliability and authenticity are not analyzed.
4. Inaccurate market forecast
Under the condition of market economy, if a construction project cannot occupy the market, or the market share is very small, it will be difficult for the project to survive; Therefore, market forecasting is very important in the feasibility study, and it must not be taken lightly; Some market forecasts for feasibility studies lack investigation and research on market demand (including apparent demand and potential demand) within the product sales area, analysis on product life cycle, competition analysis on alternative products, price analysis, risk analysis and marketing strategy analysis.
5. Artificial mixing of "water"
For example, some intentionally lower equipment prices and construction and installation costs, reducing investment estimates; Some intentionally lower costs, raise product prices, produce at full capacity, no inventory backlog, and increase economic benefits; Some downplay various risks and deliberately reduce project risks; The "feasibility" is formulated as "approvability", or even "gullibility".
For the above reasons, it is recommended to invite professionals Lanzhou feasibility study report writing An excellent feasibility study report must be complete in content, understand the policy, measure accurately, and have a clear forecast of the market. Only in this way can the project be feasible.