For projects that use foreign loans to introduce technology and equipment, in order to find out the foreign technical level and business situation, relevant professionals can be sent to form a capable investigation team to go abroad for technical investigation and preliminary business inquiry, or invite relevant foreign manufacturers for technical exchange. For projects with complex technology and no domestic construction experience, if necessary, foreign engineering consulting companies can be entrusted to carry out feasibility studies, or foreign experts can be employed for consultation. Before the feasibility study report is submitted for approval, relevant departments and local authorities shall organize experts from relevant design, scientific research institutions, enterprises and relevant parties to conduct further demonstration and preliminary review, and write a preliminary review report. The contents are as follows:
(1) Determine the project construction scale and product scheme according to market survey and economic forecast;
(2) Implementation of resources, raw materials, fuels and utilities;
(3) Construction conditions and site selection scheme;
(4) Technical process, main equipment selection, construction standards and corresponding technical and economic indicators; If technical equipment is imported, the country of origin and the distribution plan of equipment at home and abroad shall be stated; Lanzhou Feasibility Study Report
(5) Composition, overall scheme and civil engineering estimate of main single works, public auxiliary facilities and cooperative supporting works;
(6) Environmental protection, urban planning, earthquake prevention, flood control, cultural relics protection, resettlement and other requirements and corresponding measures and schemes;
(7) Enterprise organization, labor quota and personnel training ideas;
(8) Construction period and implementation schedule;
(9) Investment estimation and fund implementation plan, including foreign loans, domestic counterpart funds, production working capital estimation, sources and financing methods;
(10) Utilize foreign loan scheme, including main procurement contents and procurement methods; List the main electromechanical equipment and materials (including quantity, model and main technical parameters);
(11) Evaluation of economic and social benefits, including financial and economic feasibility analysis of the project from different angles using dynamic analysis and sensitivity analysis methods, and calculation of economic indicators such as different investment profit rates, internal rate of return, investment payback period, loan repayment period, etc;
(12) Loan repayment, including foreign exchange balance, arrangement opinions of relevant departments on foreign loan repayment and repayment methods;