-
1、 The assessment is based on relevant laws, regulations, plans, industry access conditions, industrial policies, relevant standards and specifications, energy saving technologies, product recommendation catalogue, energy consumption products, equipment, production processes and other catalogues explicitly eliminated by the state, as well as relevant engineering data and technical contracts. 2、 Project overview (I) Basic information of the construction unit. Name, nature, address and zip code of the construction unit
Published on: June 28, 2023 Clicks: 28
-
1. The EIA report is divided into report, report form and registration form. The classification method is based on the Catalogue of Classified Management of Environmental Impact Assessment of Construction Projects issued by the Ministry of Environmental Protection. 2. A simple registration form only needs to be filled in on the website of the environmental protection department. You can fill in the form yourself or ask the environmental assessment company to help you fill it out. 3. Charges for reports and report forms are mainly based on the complexity of the project(
Published on: April 19, 2023 Clicks: 38
-
There is no fixed format for the list of Gansu project energy saving report, and everyone has their own list. Generally, the following shall be provided: (for reference only) 1. Feasibility study report of the project 2. Environmental assessment report of the project 3. Local energy supply of the project 4. List of energy consuming equipment (motor model, power, number of units) 5. List of structures 6. Overview of energy measuring instruments of the project
Published on: March 16, 2023 Number of hits: 45
-
According to the Measures for Energy Conservation Review of Fixed Assets Investment Projects (No. 44 Order of the National Development and Reform Commission): which projects need to do Gansu project energy conservation report writing 1. Industries that do not need to do energy conservation (report) assessment 1. Wind power plants, photovoltaic power plants (solar thermal), biomass energy, geothermal energy, nuclear power plants, hydropower plants, pumped storage power plants; 2. Power grid engineering, oil pipeline network, gas pipeline
Published on: March 13, 2023 Clicks: 36
-
(1) Energy saving measures 1. Energy saving technical measures. Energy saving technical measures in production process, power, building, water supply and drainage, HVAC, lighting, control, electrical and other aspects, including new energy saving technologies, new processes, new equipment applications, waste heat, residual pressure, combustible gas recovery and utilization, building envelope and thermal insulation measures, comprehensive utilization of resources, new energy and renewable energy utilization
Published on: October 8, 2022 Clicks: 49
-
1、 The assessment is based on relevant laws, regulations, plans, industry access conditions, industrial policies, relevant standards and specifications, energy saving technologies, product recommendation catalogue, energy consumption products, equipment, production processes and other catalogues explicitly eliminated by the state, as well as relevant engineering data and technical contracts. 2、 Project overview (I) Basic information of the construction unit. Name, nature, address and zip code of the construction unit
Published on: September 30, 2022 Clicks: 88
-
(1) Energy conservation report of fixed asset investment projects: according to energy conservation laws, regulations, standards and specifications, analyze and evaluate the scientificity and rationality of energy use of fixed asset investment projects, propose countermeasures and measures to improve energy utilization efficiency and reduce energy consumption, and prepare energy conservation report. (2) Energy: refers to coal, oil, natural gas, biomass energy and electricity
Published on: September 22, 2022 Clicks: 53
-
1. The Energy Conservation Law of the People's Republic of China clearly states that the state implements the energy conservation assessment and review system for fixed asset investment projects. For projects that do not meet the mandatory energy conservation standards, the authorities responsible for project examination and approval or examination and approval according to law shall not approve or approve the construction; The construction unit shall not start construction; Those that have been completed shall not be put into production or use. 2. The State Council on Strengthening the Festival
Published on: May 26, 2022 Clicks: 63