1. The EIA report is divided into report, report form and registration form. The classification method is based on the Catalogue of Classified Management of Environmental Impact Assessment of Construction Projects issued by the Ministry of Environmental Protection.
2. A simple registration form only needs to be filled in on the website of the environmental protection department. You can fill in the form yourself or ask the environmental assessment company to help you fill it out.
3. The charges for the report and report form are mainly determined according to the complexity of the project (for example, compared with light industry, building materials and aquaculture, the former is more complex), the investment amount of the project, the monitoring or investigation content that needs to be supplemented in the preparation process, and the various risks existing in the project.
Generally, the person receiving the project will make a quotation after understanding the above mentioned situation of the project. The approximate price is: the report table fluctuates between 10000 and 50000 yuan; The report fluctuates even more, about 100000 yuan, and there are many chemical projects with hundreds of thousands, especially large water conservancy and hydropower projects and trans provincial projects with millions.
3. As for the basis of quotation and charge, there are two. One is the Notice of the State Development Planning Commission and the State Environmental Protection Administration on Relevant Issues of Regulating Environmental Impact Consulting Fees (JJG [2002] No. 125), and the other is the Notice of the National Development and Reform Commission on Relevant Issues of Reducing the Charging Standards of Some Construction Projects and Regulating Charging Behavior (FGJG [2011] No. 534). These are documents 10 or 20 years ago, which have little guiding effect on the current EIA market and can only be used as a reference.
In addition, there is also a charging basis, which is the Quick Reference Table of Report Preparation and Appraisal Cost, and the Quick Reference Table of Report Preparation and Appraisal Cost, which are often used before. These two tables estimate the preparation cost and appraisal cost based on the total investment of the project. Generally speaking, it is only for reference. In the actual negotiation, both parties have many issues to consider, which should be considered comprehensively. Gansu Project Energy Saving Report Writing
4. Summary
Generally speaking, the quotation is generally based on the overall situation of the project and judged in many aspects. Doing environmental assessment is not only to make a report, especially the report, which involves a lot of things. We should not only make good relations with the environmental protection department, but also ensure the quality and time to avoid being spot checked and notified. Now the report is getting thicker and thicker, the risk is also increasing, and the competition is also intensifying. Therefore, there is no clear and fixed mode of charging price, which requires comprehensive judgment.