According to the Measures for Energy Conservation Review of Fixed Assets Investment Projects (NDRC Order No. 44): what projects need to be done Gansu Project Energy Saving Report Writing
1、 Industries not subject to energy conservation (report) assessment
1. Wind power station, photovoltaic power station (solar thermal), biomass energy, geothermal energy, nuclear power station, hydropower station, pumped storage power station;
2. Power grid engineering, oil pipeline network, gas pipeline network;
3. Water conservancy, railways (including independent railway bridges and tunnels), highways, urban roads, and inland navigation;
4. Information (communication) network (excluding data center), e-government, satellite ground system;
2、 In addition to the above industries, if the project meets one of the following conditions, an energy conservation (assessment) report is required:
1. The annual comprehensive energy consumption exceeds 1000 tons of standard coal;
2. Annual power consumption exceeds 5 million kilowatt hours;