1、 Role of Lanzhou Feasibility Study Report
1. Basis for investment decision
For government invested projects, the conclusion of the feasibility study is the basis for the approval and decision of the competent government investment department. For enterprise investment projects, the conclusion of the feasibility study is the basis for internal investment decisions of enterprises. The conclusion of the feasibility study can be used as the basis for preparing the project application.
2. Basis for raising funds and applying for loans
3. Basis for preparing preliminary design documents

Generally, the preliminary design (or basic design) can be carried out only after the feasibility study report is completed.
2、 Basic requirements for feasibility study: (1) predictability (2) objectivity and impartiality (3) reliability (4) scientificity
3、 Key contents of feasibility study: 1. Necessity of project construction 2. Market and competitiveness analysis 3. Construction scheme 4. Investment estimation and financing scheme 5. Financial analysis and economic analysis 6. Economic impact analysis 7. Resource utilization analysis 8. Land use and resettlement scheme analysis 9. Social evaluation or social impact analysis 10. Risk analysis. In addition, environmental impact assessment, safety pre assessment and energy conservation assessment of construction projects are also required.
IV Lanzhou Feasibility Study Report Depth requirements of
(1) Meet the needs of decision makers to make plans and projects.
(2) The feasibility study should be market-oriented, work around enhancing core competitiveness, focus on economic benefits or investment effects, optimize the scheme to the maximum extent, and improve investment benefits or effects. Make necessary prompts for possible risks of the project.
(3) The specifications and parameters of the main equipment selected in the feasibility study shall meet the requirements of pre ordering. The data of imported technical equipment shall meet the requirements of contract negotiation.
(4) The major technical and financial plans in the feasibility study should be compared with two or more plans.
(5) The main engineering technical data determined in the feasibility study shall meet Preliminary design of the project Requirements.
(6) Itemized detailed estimation method shall be adopted for the estimation of investment and cost, and the accuracy shall meet the requirements of decision-makers.
(7) The financing scheme determined in the feasibility study should meet the needs of credit decision-making of financial institutions.
(8) It shall reflect the major disagreements on some schemes occurred in the process of feasibility study and the reasons for not being adopted.
(9) The feasibility study report shall comply with relevant laws, regulations and policies, as well as relevant provisions and requirements of the investor or investor.