Our company and the entrusting unit Project Feasibility Study Report The scope, key points, depth requirements, completion time, cost budget and quality requirements of the preparation work shall be exchanged, and the entrustment agreement shall be signed to carry out the work at each stage of the feasibility study.
2、 Establish a working group
Establish a project feasibility study team according to the workload, content, scope, technical difficulty, time requirements, etc. of the entrusted project feasibility study. The Chief Engineer and Chief Economist shall be responsible for overall coordination in order to coordinate the work of each professional group and ensure the overall quality of the feasibility study report. The project team is divided into:
(1) Industry and market team, responsible for studying industry related information and market research;
(2) Text preparation team;
(3) Technical Solutions Group;
(4) Financing and Finance Team;
(5) Policy and Legal Group.
3、 Develop work plan
The content includes the scope, focus, depth, schedule, staffing, cost budget and Lanzhou Feasibility Study Report Prepare the outline and exchange opinions with the client.
4、 Research and collect data
According to the outline of the feasibility study report, each professional team conducts field investigation, collects and collates relevant data, including market and social investigation, investigation to industry competent departments, investigation to the project area, investigation to relevant enterprises and units involved in the project, and collection of project construction Relevant background information and latest project progress information and data necessary for production and operation.
5、 Scheme preparation and optimization
On the basis of investigation, research and data collection, study and prepare alternative plans for the project's construction scale and product plan, site plan, technical plan, equipment plan, engineering plan, public works and auxiliary works plan, environmental protection plan, organization setting plan, implementation schedule plan, project investment and financing plan, etc. After scheme demonstration, comparison and optimization, the recommended scheme is proposed.
6、 Project evaluation
Carry out environmental assessment, financial assessment, national economic assessment, social assessment and risk analysis on the recommended scheme to determine the environmental feasibility, economic feasibility, social feasibility and anti risk ability of the project. When the conclusions of relevant evaluation indicators are insufficient to support the establishment of the project scheme, the original design scheme shall be adjusted or redesigned.
VII Gansu Feasibility Study Report Preparation
The professional schemes of the feasibility study of the project, after technical and economic demonstration and optimization, shall be prepared by each professional group. After comprehensive summary, the first draft of the feasibility study report is proposed.
8、 Exchange opinions with the entrusting unit
After the first draft of the feasibility study report is formed, exchange opinions with the entrusting party, revise and improve it, and form a formal feasibility study report.
9、 Cooperate or organize expert review
For the feasibility study report that needs to be reviewed, our institute can cooperate or organize expert review by itself, and modify the feasibility study report according to the expert review opinions, and finally finalize it.