Lanzhou project feasibility study report is under preparation Purpose and characteristics of project owner management
1、 Purpose and characteristics of project owner management
(2) Purpose of the Owner's management
(1) Realize the investment objectives and expectations of investors.
(2) Control the project investment within the predetermined or acceptable range
(3) Ensure that the project functions and quality meet the design standards after completion of the project. The function and quality requirements are the basic premise to achieve the project construction goal and the owner's investment goal. Lanzhou Feasibility Study Report to write
2、 Main tasks of project owner management
(1) Main tasks in the early stage of the project
(1) Make a preliminary conception of the investment direction and content.
(2) Select a consulting agency. Formally select qualified consulting institutions to carry out the preliminary work of the project.
(3) Organize the project Project Proposal Review with the feasibility study report, communicate with relevant investors and lenders, and implement the project funds, construction land, technical equipment, supporting facilities and other construction related conditions.
(4) Make decisions on the project and report to relevant departments for approval, approval or filing.

(2) Main tasks in project preparation stage
(1) Prepare approval documents for project site selection, resource utilization, environmental protection, etc., negotiate and obtain agreement documents for supply of raw materials, fuel, water, electricity, etc. and transportation.
(2) Define the scope and design depth of survey and design (13), select survey and design units to conduct survey and design, sign contracts, and conduct contract management.
(3) Timely handle the approval of relevant design documents.
(4) Organize the implementation of project construction land, handle land acquisition, demolition compensation and construction site leveling (13).
(5) Organize and carry out equipment procurement and project construction bidding and bid evaluation, select qualified contractors and sign contracts.
(6) Provide necessary living and material security for designers to work on the construction site according to relevant regulations.
(7) Select qualified site representatives and appropriate engineering supervision organization. (07)
(3) Main tasks in the project implementation phase
(1) All approval procedures that need to be handled by the owner, such as construction permit, and public facilities such as roads, pipelines, power, communication, etc. that may be damaged during construction, need to obtain the application approval procedures specified by laws and regulations.
(2) Water, electricity, communication lines and other necessary conditions for construction shall be solved through negotiation (06).
(3) The access between the construction site and the urban and rural public roads, as well as the main traffic arteries in the construction site that should be solved by the owner as agreed in the special provisions, should meet the needs of construction transportation.
(4) Provide the Contractor with engineering geology, underground pipelines and other data of the construction site to ensure the authenticity of the data (13).
(5) Employ a consulting supervision organization to urge the supervision engineer to be in place in time and perform his duties.
(6) Coordinate the relationship between design and construction, supervision and construction, and organize the contractor and the consulting design unit to conduct joint review of drawings and design disclosure—— Design disclosure: ① organized by the Owner; ② Design unit → contractor.
(7) Determine bench marks and coordinate control points, submit them to the Contractor in writing, and conduct on-site inspection.
(8) Organize or entrust the supervising engineer to review the construction organization design (14)—— Construction organization design: prepared by the Contractor, and reviewed by the Owner or entrusted supervising engineer.
(9) Coordinate the protection of underground pipelines around the construction site and adjacent buildings and structures, as well as related cultural relics and ancient trees, and bear the corresponding costs (06).
(4) Main tasks of project completion acceptance
(1) Organize trial operation—— Commissioning Owner Organization
(2) Organize relevant parties to carry out completion acceptance and final account of the project to be delivered by the construction unit.
(3) Handle project handover procedures
(4) Collect and take over relevant data of the project
(5) Arrange training for relevant management and technical personnel and take over in time
(6) Further clarify the relationship with the construction party, consulting engineer and other parties after the project operation
[2013 True Title] Clarifying the scope and depth of survey and design is the main task of (C) in the project preparation stage.
A. Project consultant B Project construction unit
C. Project Owner D Government management department
[2007 real question] It is the main task of the Owner at stage (B) to select a qualified supervision organization.
A. Project Decision B Project preparation
C. Project implementation D Project acceptance
[2006 real question] The main task of the Owner in (C) is to solve the necessary conditions of water and electricity for construction through negotiation.
A. Project decision-making stage B. Project preparation stage
C. Project implementation stage D. Project acceptance stage
[2013 True Question] It is (D)'s task at the project implementation stage to provide meteorological and underground pipeline data at the construction site.
A. Government management department B Designer
C. Construction unit D owner
[2014 True Title] At the project implementation stage, the main body organizing the review of construction organization design is (B).
A. Contractor B Project Owner
C. Designer D Engineering Quality Supervision Department
[2006 True Title] In the project implementation phase, the protection of cultural relics and ancient trees related to the enclosure of the construction site should be coordinated and handled, and the corresponding costs should be borne by (B).
A. Contractor B Owner
C. Consulting engineer D Government functional departments