1. Project summary: a summary description of the project content, including the project name, construction unit, construction site and scale, construction content, estimated total investment, capital source and use plan, construction period, project benefits, etc;
2. Basic information of the project undertaking unit: including personnel, fixed assets, professional skills and management system;
3. Analysis of project site selection: the site selection of the project construction site should be intuitive and accurate, the specific plot location should be determined, and the infrastructure related to the project construction content should be described. The situation of the project construction site cannot be replaced by the situation of the county. The specific contents include the specific location of the project, the project implementation scale, the land, electricity, water and other resources in the project area, the public facilities, the location comparison and selection, etc.
4. Technical scheme analysis: mainly including the main technical sources and technical levels adopted by the project, the main technical process (operation) flow and technical index parameters, and the comparison of engineering measure selection schemes.
5. Project construction objectives: including the overall idea of project construction, and the objectives to be achieved after the completion of the project.
6. Project construction content: This part is the key point of the report. It is necessary to list the construction content, corresponding scale, process flow, quantities and measures item by item. If it is a financial project, the construction content mainly includes the main engineering technical measures. If it is a capital construction project, the construction content mainly includes construction and installation works, civil works, equipment purchase, etc.
7. Investment estimate and fund raising: according to the construction content and relevant construction standards or specifications, the total investment, sub item investment, and the percentage of each investment in the total investment of the project are clearly described, and the project estimate is divided into engineering costs (including engineering measures or construction and installation works, civil works, equipment purchase), other costs (including preliminary work costs, management costs, completion inspection fees) The investment situation of the three secondary and tertiary catalogs of unforeseen expenses is clearly described, and the fund raising plan and the main purpose of different fund sources are clearly defined. Lanzhou Feasibility Study Report compose
8. Construction period and implementation schedule: determine the construction period and select the best implementation schedule according to the project plan and the time and schedule requirements for instrument and equipment procurement, engineering construction, installation and commissioning.
9. Project guarantee measures: mainly including project organization management, project construction management, fund use management, asset management, etc.
10. Benefit analysis: measure and analyze the economic, social and ecological benefits after the completion of the project (quantitative analysis is preferred, and qualitative analysis can also be assisted if some data cannot be collected).
11. Relevant evidentiary materials and attached forms and drawings: various attachments, schedules, figures and relevant evidentiary materials shall be true and complete.
12. For other general skills, please refer to the specific contents in the feasibility study description.