Welcome to the official website of Lanzhou Zhiyuan Engineering Project Management Service Co., Ltd! Main business of the company: Lanzhou Feasibility Study ReportLanzhou Environmental Impact Assessment ReportGansu Project Energy Saving Report Writing

National free consultation hotline

eighteen billion nine hundred and ninety-three million fifty-two thousand one hundred and ninety-eight

thirteen billion nine hundred and ninety-one million eight hundred and sixty-one thousand five hundred and thirty-eight

 Lanzhou Feasibility Study Report

contact us

Company name: Lanzhou Zhiyuan Engineering Project Management Service Co., Ltd

Contact: Manager Wang

Tel.: 18993052198

Fax: 0931-4648738

Email: [email protected]

Address: 15/F, Hongye Building, No. 91 Qingyang Road, Chengguan District, Lanzhou City, Gansu Province (Jingning Road and Qingyang Road Shizi)

website: coursescloud.cn

Feasibility and economic and technical demonstration of environmental protection measures

Your current location: home page >> News Center >> Industry News

Feasibility and economic and technical demonstration of environmental protection measures

Date of issue: 2022-08-27 Author: Lanzhou Zhiyuan Click:

Feasibility and economic and technical demonstration of environmental protection measures

(1) Air pollution prevention

Give the process of waste gas purification system and dust removal system of the construction project Equipment model, efficiency, operating cost and emission index; Analyze whether the emission indicators meet the emission standards; Discuss the feasibility of the proposed treatment process and equipment; Analyze whether the exhaust funnel conforms to the table Phasor regulations.

(2) Wastewater treatment

The process principle, flow, treatment efficiency and discharge index of wastewater treatment measures are given; Analyze whether the emission indicators meet the emission standards; Describe the feasibility of the proposed wastewater treatment process Lanzhou Environmental Impact Assessment Report

 Lanzhou Environmental Impact Assessment Report

(3) Waste residue treatment

Put forward the discharge direction, treatment and disposal method of waste residue, if it is dangerous solid The declaration must be made in accordance with the relevant regulations, and a qualified unit must be entrusted to handle it It shall not be disposed of or transferred illegally

(4) Damping and noise prevention

Specific measures to reduce vibration and noise are proposed Analyze the feasibility of the proposed measures.

Website: //coursescloud.cn/news/592.html

key word: Preparation of Lanzhou Environmental Impact Assessment Report , Write Lanzhou environmental impact assessment , Preparation of Gansu Environmental Impact Assessment Report

Recent browsing:

Lanzhou Zhiyuan Engineering Project Management Service Co., Ltd

 image.png Address: 15/F, Hongye Building, No. 91 Qingyang Road, Chengguan District, Lanzhou City, Gansu Province (Jingning Road and Qingyang Road Shizi)
 image.png Tel: 18993052198; 0931-4648738
 image.png Email: [email protected]


 Lanzhou Project Appraisal Consultation Gansu Feasibility Study Report
We can contact with each other in wechat Follow the official account


full name
Telephone
mailbox
content
Hot products |Main business area: Gansu Lanzhou Jiayuguan Jinchang Wu Wei Jiuquan Zhangye silver Pingliang Qingyang
  • Online Service
  • contact number
    eighteen billion nine hundred and ninety-three million fifty-two thousand one hundred and ninety-eight
  • Online Message
  • Online consultation
    Welcome to leave us a message
    Please enter your message here, and we will contact you as soon as possible.
    full name
    contacts
    Telephone
    Landline/mobile number
    mailbox
    mailbox
    address
    address