For example, the current situation of surface water and atmospheric environment quality in the environmental quality assessment of this project is based on the data information database of XX Environmental Monitoring Station, XX JZ (XXXX) No. XX. The noise status is based on the monitoring data of XX Municipal Environmental Monitoring Station on the status of environmental impact assessment on the environmental noise of the project site on XX, XXXX (XX Jian Zi (XXXX) No. XXX).
1、 Surface water environmental quality
2、 Ambient air quality
3、 Noise environment quality
4、 Ecological environment
(Note: the above should be described in words, and the corresponding data analysis should be provided at the back of the table)
Environmental protection objectives (list and protection level):
According to the characteristics of pollutant generation and discharge of the project, the main environmental protection objectives of the project are determined as follows. Lanzhou Environmental Impact Assessment Report to write
Price applicable standard
Construction project engineering analysis
Brief description of process flow and pollution process flow
The engineering analysis of this project includes two parts: construction period and operation period.