1. Necessary documents: planning certificate, land certificate, planning and design notice, land preliminary review notice, construction site permit
2. External environmental impact: whether there are traffic roads, gas stations, substations, high-voltage lines, gas stations, industrial plants and other specific locations and distances around the project (if there are plants: their main products, pollutants)
3. Commercial layout, whether there are kindergartens, public toilets, garbage collection points, catering, etc. If yes, pay attention to whether the location of the planning and design is reasonable. If not, it is recommended to adjust the layout. In particular, the location and pretreatment facilities should be planned for catering
4. Regional planning of the project site
5. Heating: central heating source (specific to the name of heating unit), pipeline layout.
6、 Heat supply certificate
Drainage: name, location, sewage treatment capacity, water collection scale, operation time, treatment process and acceptance capacity of the sewage plant discharged into. Drainage certificate
Four boundaries of the project: longitude and latitude, the distance from the four boundaries to the project, whether there are sensitive factors, specific location, distance
7. Number of people living and producing
8. Parking space: motorized/non motorized ground/underground
9. Equipment room: pump room, substation, heat exchange station, public facilities, location (which side of the building), close to residential buildings
10. Underground building condition Exhaust mode of underground garage
11. Power of Attorney Agreement