about Lanzhou Environmental Impact Assessment Report Description of writing content:
(1) Overview of construction project
1. Location and relevant background of the construction project;
2. The main construction content, production process, production scale, construction period and investment (including environmental protection investment) of the construction project, with project characteristics table attached;
3. Comparison and selection of construction project site selection and route selection schemes, and compliance with laws and regulations, policies, planning and planning environmental assessment.
(2) Current situation of the surrounding environment of the construction project
1. Environmental status of the construction project site;
2. Scope of environmental impact assessment of the construction project (attached with relevant drawings).
(3) Environmental impact prediction of the construction project and the main measures and effects to be taken
1. The main pollutant types, emission concentrations, emissions, treatment methods, emission methods and ways of the construction project and their up to standard emissions, as well as the ways, ways and scope of ecological impacts; Lanzhou Environmental Impact Assessment Report
2. Distribution of environmental protection targets within the scope of construction project assessment (attached with relevant maps);
3. Introduce the main environmental impacts of the construction project and its prediction and assessment results according to different environmental factors and stages;
4. For construction projects involving legal environmental sensitive areas, the main environmental impacts on environmental sensitive areas and the prediction and assessment results shall be separately introduced;
5. Introduce pollution prevention measures, implementation standards, compliance and effects, and ecological protection measures and effects according to different environmental factors;
6. Environmental risk analysis and prediction results, risk prevention measures and emergency plans;
7. Technical and economic demonstration results of environmental protection measures of the construction project;
8. The economic profit and loss analysis results of the impact of the construction project on the environment;
9. Units and residents involved in relocation within the protection distance of the construction project and relevant measures;
10. The environmental monitoring plan and environmental management system to be adopted by the construction unit.
(4) Public participation
1. The frequency, content and method of environmental information disclosure;
2. The scope, frequency and form of soliciting public opinions;
3. Organizational form of public participation;
4. Summarize and analyze public opinions, and explain the handling of public opinions, especially objections;
5. Summarize the public participation from the aspects of legality, effectiveness, representativeness and authenticity.
(5) Conclusion of environmental impact assessment
(6) Contact information
Contact person and detailed contact information (including address, zip code, telephone, fax and e-mail) of the construction unit and EIA agency.