Domestic waste incineration power generation project Lanzhou Environmental Impact Assessment Report Several principles of approval are as follows:
(1) Industrial policy. From the perspective of the current national industrial policy, the Interim Provisions on Promoting the Adjustment of Industrial Structure (GF [2005] No. 40), the Administrative Measures for the Identification of the Comprehensive Utilization of Resources Encouraged by the State (FGHZ [2006] No. 1864) and other documents of the State Council clearly stipulate that this type of project is encouraged.
(2) Compliance with planning and regulations. Whether it conforms to relevant plans and regulations, including urban master plan, township plan, environmental health plan, Notice on Strengthening the Environmental Impact Assessment Management of Biopower Projects (HF [2006] No. 82), Notice on Further Strengthening the Environmental Impact Assessment Management of Biopower Projects (HF [2008] No. 82) The consistency between the document requirements and the nature of land use. Lanzhou Environmental Impact Assessment Report
(3) Pollution prevention measures. The technical and economic feasibility of pollution prevention measures, whether the pollutants can be discharged stably up to the standard, and whether the funds can be put into place.
(4) About environmental capacity. It mainly refers to the status quo of environmental quality, the degree of environmental impact that the project construction may bring, and whether the impact after operation can meet the environmental function requirements.
(5) Total amount control. Whether the total amount of pollutant discharge can obtain a legal balance way to meet the requirements of total amount control of environmental protection.
(6) Clean production level. It mainly refers to the domestic and international level of the project in terms of environmental protection, advancement of process equipment, resources, energy consumption, pollutant generation, emission level, environmental management, etc.
(7) Public survey opinions. The State Environmental Protection Administration attaches great importance to the public opinion survey of infrastructure construction, especially waste incineration power generation projects, and has made clear requirements on the way of public survey, the representativeness of survey samples, the authenticity of results, the explanation of whether opinions are adopted, and the return visit of the public.