What are the main contents of Hangzhou project construction plan
1、 General layout
1. Scope of project site: define the boundary of project construction, usually marked with red lines.
2. Surrounding environment: Mark the surrounding natural and artificial environment elements such as roads, buildings, rivers, mountains, etc. to understand the relationship between the project and the surrounding.
3. Division of construction area: divide the whole project site into different construction areas, such as main works area, temporary facilities area, material stacking area, processing area, etc., to facilitate construction organization and management.
2、 Layout of temporary facilities
1. Temporary roads: temporary roads during construction are planned, including road direction, width, pavement structure, etc., to ensure smooth passage of construction vehicles and personnel.
2. Temporary water and electricity supply: mark the access point, line direction and supply scope of temporary water and power sources to meet the demand for water and electricity during construction.
3. Temporary office area and living area: arrange temporary living facilities such as office area, dormitory, canteen and toilet for construction management personnel and workers to provide a good working and living environment.
4. Warehouse and storage yard: plan material warehouse, component and accessory storage yard, equipment parking yard, etc. to facilitate the storage and management of materials and equipment.
3、 Construction layout of main works
1. Building location: accurately mark the location, coordinates and dimensions of the building for construction positioning.
2. Foundation engineering construction: show the construction method and sequence of foundation engineering, such as earthwork excavation, foundation pouring, pile foundation construction, etc.
3. Construction of main structure: describe the construction technology and process of main structure, such as formwork engineering, reinforcement engineering, concrete engineering, etc., and mark the location and coverage of vertical transportation equipment (such as tower crane, construction elevator) for construction.
4. Decoration engineering construction: plan the construction sequence and regional division of decoration engineering, including interior and exterior wall decoration, ground engineering, roof engineering, etc.
4、 Display of construction schedule
1. Timeline: mark the timeline on the construction planning drawing to specify the start time and completion time of each construction stage.
2. Key nodes: highlight the key nodes of the project, such as foundation completion, main structure capping, completion acceptance, etc., to facilitate the control and supervision of construction progress.
5、 Layout of safety and environmental protection facilities
1. Safety protection facilities: mark the safety protection facilities at the construction site, such as fences, guardrails, safety nets, warning signs, etc., to ensure construction safety.
2. Environmental protection facilities: sewage treatment facilities, garbage collection points, dust reduction facilities, etc. are planned to reduce the impact of construction on the environment.
6、 Notes and descriptions
1. Dimensioning: Dimensioning various facilities and buildings in the construction planning drawing to facilitate construction setting out and control.
2. Legend description: provide the legend of the construction planning drawing, and explain the meaning of various symbols and graphs.
3. Technical description: the special construction requirements, technical difficulties, etc. in the construction planning drawing shall be described in words to provide technical guidance for construction.