In principle, the Lanzhou project application report is prepared by a qualified engineering consulting agency, and the qualified project undertaking unit can also prepare its own. Fund application report The preparation of shall meet the following requirements:
(1) Content authenticity: The content involved in the fund application report and the data reflecting the situation should be as authentic and reliable as possible to reduce deviations and errors. The materials and data used in it should be repeatedly verified to ensure the authenticity of the content and prevent fraud.
(2) Accurate prediction: in-depth investigation and research must be carried out, sufficient information must be possessed, and practical prediction methods must be used to scientifically predict future prospects.
(3) Rigorous argumentation: argumentation is a prominent feature of the fund application report. To make it argumentative, we must use systematic analysis methods to conduct comprehensive and systematic analysis around various factors affecting the project, including macro analysis and micro analysis.
Lanzhou Fund Application Report Preparation data before preparation:
1. Overview of the fund applicant (including its main business, operating years, assets and liabilities, shareholder composition, main investment projects, existing production capacity, etc.)
2. Relevant information of the project (total project investment, fund raising, project progress, and fund utilization plan at each stage, etc.)
3. Statement of fund items declared by the fund declaration unit and reasons for declaration
4. Project products and introduction, output, estimated sales price, direct cost and list (including main material specifications, sources and prices).
5. Evaluation of the project by the fund applicant (SWOT), social value and economic value of the project
6. Annual income of the project (income from products and services)
7. Annual operating costs of the project (direct costs, raw materials, power costs, annual depreciation costs, amortization costs, the number of people to be added to the project, the proposed department and wage level, and the estimated total wages of the project (including welfare expenses))
8. VAT, income tax rates, other subsidies and preferences enjoyed by the company.
9. Other data and information shall be communicated at any time according to the needs of the feasibility study.