(1) Project name, sponsor and person in charge of the project;
(2) Project content and application reasons;
For the imported equipment, the reasons for the proposed import, the outline of the production process and production conditions, the name, brief specification and quantity of the main equipment, the name and content of the proposed import technology, and the technical gap and investment overview at home and abroad, as well as the technical gap and overview at home and abroad shall be stated.
(3) Import country and manufacturer;
Full name of the manufacturer in the country to be inquired, including the name in foreign language;
(4) Basic information of the undertaking enterprise;
The factory is newly built, reconstructed or expanded, location and other basic information;
(5) Product name, brief specifications, production capacity and sales direction (domestic sales, export sales);
(6) Recent and future requirements and existing conditions of main raw materials, electricity, fuel, transportation and cooperation. In case of mine, oil field and other projects, the implementation of resources shall also be explained; Gansu Feasibility Study Report
(7) Estimation and source of project funds:
1) The total amount of foreign exchange used by the project. Including the amount and purpose of foreign exchange used in the working stage of the equipment (both converted into US dollars and 10000 yuan, and the conversion rate shall be stated if non US dollar foreign exchange is used);
2) The source of foreign exchange resources (application for national allocation of spot exchange or deferred payment, utilization of foreign capital loans, compensation trade, self raised foreign exchange, etc.) and the repayment method (national unified repayment, enterprise self repayment). This point should also be Fund application report Embodied in.
3) Estimates and sources of domestic costs. Including capital construction investment;
(8) Project schedule;
(9) Preliminary technical and economic analysis.