1. The overall structure meets the requirements
Environmental Impact Assessment Report The overall structure of the book should meet the requirements of the national technical guidelines for environmental assessment, with comprehensive content and prominent focus.
2. Reliable basic data
The basic data is the basis of the evaluation. If there are errors in the basic data, especially in the emissions of pollution sources, even if the correct calculation mode and accurate calculation are used, the calculation results will be wrong. Therefore, the basic data must be reliable. If the same parameter data from different sources are different, it shall be verified. Lanzhou Environmental Impact Assessment Report compose
3. Reasonable prediction mode and parameter selection
The prediction models of environmental impact assessment have certain applicable conditions, and the parameters are different due to different pollutants and environmental conditions. Therefore, the prediction model and parameter selection should be analyzed specifically, and the model with similar or identical derivation conditions and evaluation conditions should be selected.
4. The conclusion is clear, objective and credible
The conclusion must give a clear answer to the feasibility of the construction project and the rationality of the site selection, and cannot be ambiguous. The conclusion must be based on the objective argument in the report, and cannot be emotional.
5. Accurate expression and reasonable length
The sentences are smooth, clear and concise, and the length is not easy to be too long. All comprehensive and conclusive charts shall be placed in the main body of the report, and the charts with reference value shall be placed in the annexes of the report to reduce the length.
6. Signature meets the requirements
The environmental impact report shall be signed with the assessment qualification certificate and the report. The report preparation personnel shall sign and seal the report in turn according to the general administrative director, the general technical director, the technical reviewer and the general project director, and the report preparation personnel shall sign and seal the report.