-
The energy conservation evaluation report of fixed asset investment projects shall include the following contents: 1. Evaluation basis; 2. Project overview; 3. Energy supply assessment, including the assessment of the energy and resource conditions of the project location and the impact of the project on the local energy consumption; Energy saving report writing of Gansu project 4. Energy saving assessment of project construction scheme, including project site selection, general layout, production process
Published on: June 28, 2023 Clicks: 33
-
(1) The difference between this revision of the plan and the original plan is analyzed in detail through a list. The content should include the planning scope, industrial orientation, land composition, planning layout, public infrastructure construction, etc. The whole report is closely related to the revision; (2) Carry out retrospective assessment in the depth of retrospective environmental assessment, including review of infrastructure construction in the park, pollution control measures of enterprises entering the park
Published on: June 14, 2023 Clicks: 40
-
In the past, enterprise design business processes may need to be repeatedly discussed at many meetings before being implemented and tried, which is a long process and a waste of cost. Now, with the emergence of SAAS (Software as a Service), enterprises can take advantage of
Published on: May 31, 2023 Clicks: 34
-
1. The EIA report is divided into report, report form and registration form. The classification method is based on the Catalogue of Classified Management of Environmental Impact Assessment of Construction Projects issued by the Ministry of Environmental Protection. 2. A simple registration form only needs to be filled in on the website of the environmental protection department. You can fill in the form yourself or ask the environmental assessment company to help you fill it out. 3. Charges for reports and report forms are mainly based on the complexity of the project(
Published on: April 19, 2023 Clicks: 38
-
There is no fixed format for the list of Gansu project energy saving report, and everyone has their own list. Generally, the following shall be provided: (for reference only) 1. Feasibility study report of the project 2. Environmental assessment report of the project 3. Local energy supply of the project 4. List of energy consuming equipment (motor model, power, number of units) 5. List of structures 6. Overview of energy measuring instruments of the project
Published on: March 16, 2023 Number of hits: 45
-
Lanzhou Zhiyuan specializes in project proposal writing and feasibility study report writing services. 1. Project name 2. Overview of the project construction unit (including the main investors): the time of establishment, registered address, registered capital, enterprise nature, business scope, etc. Address, zip code and contact of the construction unit
Published on: December 20, 2022-10 Number of hits: 222
-
1、 As the decision-maker or the main person in charge of operation and management of an enterprise, first of all, we should actively deal with the government. Know which industries are supported by the government, what specific regulations are there, whether their own enterprises meet the conditions for application, how to create conditions if conditions are insufficient, what materials and procedures are required for application, etc. There are usually several ways to learn and understand: through the government
Published on: December 6, 2022-16 Number of hits: 66
-
1. The policy oriented judgment method analyzes and evaluates the energy use scheme of the project according to the national and local energy development policies and relevant plans, combined with the natural conditions and energy utilization conditions of the project location. Applicable to project
Published on: October 13, 2022-13 Number of hits: 68
-
1、 The assessment is based on relevant laws, regulations, plans, industry access conditions, industrial policies, relevant standards and specifications, energy saving technologies, product recommendation catalogue, energy consumption products, equipment, production processes and other catalogues explicitly eliminated by the state, as well as relevant engineering data and technical contracts. 2、 Project overview (I) Basic information of the construction unit. Name, nature, address and zip code of the construction unit
Published on: September 30, 2022 Clicks: 88
-
1. Main documents related to the construction project: completed and sealed EIA entrustment; Project approval document; Project proposal; Lanzhou feasibility study report or project overview materials; Geographic location map of the project site; Plant layout plan. 2. Basic information of your company: including company name, legal person, contact information, company address, and industry 3. Basic information of the proposed project
Published on: September 18, 2022 Clicks: 61
-
1. The overall structure meets the requirements. The overall structure of the environmental impact assessment report should meet the requirements of the national technical guidelines for environmental impact assessment, with comprehensive content and prominent focus. 2. Basic data Reliable basic data is the basis for evaluation. If there are errors in basic data, especially in emissions of pollution sources, even if the correct calculation mode and accurate calculation are selected, the calculation results will also
Published on: September 14, 2022 Clicks: 74
-
Introduction to the knowledge points of Lanzhou Environmental Impact Assessment Report: 1. Environment: the overall external world with human society as the main body, which includes various natural and social factors that have been recognized and not yet recognized by human beings and that directly or indirectly affect human survival and social development. 2. Environmental impact: refers to the environmental change caused by human activities and the resulting impact on human beings
Published on: August 3, 2022 Clicks: 69
-
1. Filing (no approval system project); 2. Site selection opinions; 3. Land certificate (outside the planning area); 4. Environmental protection declaration form (not available for projects of National Environmental Protection Administration); 5. Environmental assessment standards (including standards issued at the county level and confirmation standards at the prefecture and city level); 6. Power of attorney; 7. Supporting documents of receiving water body function (flood control) of the Water Conservancy Bureau; 8. Documentary evidence of whether the project construction of the shipping bureau affects shipping
Published on: June 16, 2022 Clicks: 86
-
1. Investigate the regional status quo, the environmental status quo related to your project, what environmental problems exist, whether this EIA is needed to solve, whether the existing problems are related to the project, whether the construction of the project can solve the problem or worsen the problem. The status quo of the investigation is the groundwork for the subsequent evaluation. If it is a reconstruction and expansion project, then the existing project
Published on: June 9, 2022 Clicks: 64
-
Different types of construction projects have different impacts on the environment, and the content and format of Lanzhou Environmental Impact Report are also different. The current situation investigation, pollution source investigation, impact prediction and evaluation are mostly arranged in chapters. 1. Introduction (1) The origin of the environmental impact assessment project describes the whole process of the project establishment, the approval unit and documents, the commission of the assessment project, and the completion of the assessment
Published on: 2022-05-18 Clicks: 110
-
The feasibility study report, referred to as the feasibility study report, is a kind of written material proposed to analyze and demonstrate the feasibility of a certain construction or transformation project, a certain scientific research, and a certain business activity through comprehensive investigation and research in the early stage of formulating production, infrastructure, and scientific research plans. The feasibility study report is mainly based on the main contents and supporting conditions of the project, such as market demand
Published on: April 19, 2022 Clicks: 70
-
The Lanzhou feasibility study report is a very difficult task, which needs to be completed by the expert group or the industry director. It is an important basis for the Board of Directors to make decisions, making its long-term and visionary strategy better than the strategy thousands of miles away. Writing
Published on: April 6, 2022 Clicks: 81
-
Basic problem study The basic problem study of the feasibility study report is a more principled and systematic overview of the various thematic research reports after being consolidated and balanced. Different projects have different research contents of basic problems. At present, there are three representative ones: (1) Research on basic problems of new industrial projects: market research: focusing on solving projects
Published on: February 21, 2022 Clicks: 79
-
The project initiation application report of private enterprises shall include the following contents: applicant and project overview 1. Project applicant overview. It mainly includes the key business scope, assets and liabilities, shareholder composition and equity structure ratio of the project applicant, and brief information of previous investment in similar projects. 2. Project overview. It mainly includes the project construction site, construction content, scale and production capacity
Published on: January 18, 2022 Clicks: 78
-
1. Application documents for special funds for energy conservation 2. Basic information table of enterprises and basic information table of projects 3. Energy management of enterprises; 1) Enterprise energy management objectives; 2) Enterprise energy management organizational structure
Published on: January 5, 2022 Clicks: 128
63 in total
20 entries per page
Page: 1/4