1. Investigate the regional status quo, the environmental status quo related to your project, what environmental problems exist, whether this EIA is needed to solve, whether the existing problems are related to the project, whether the construction of the project can solve the problem or worsen the problem. The status quo of the investigation is the groundwork for the subsequent evaluation. If it is a reconstruction and expansion project, the relationship between the existing project and the proposed project must be explained clearly, and the existing project should be provided with relevant photos, especially the project on which the proposed project depends, must be provided with photos and accompanied with text descriptions. Many people have written the EIA report in a thick way, and there are many words in the report, except for the most convincing photos, maps and tables. Lanzhou Environmental Impact Assessment Report compose
2. Environmental status assessment, water, gas, sound, slag, ecological environment status assessment, speak with data. Brief introduction and basic information of project scale, geographical location, plan, surrounding environment map, power of attorney, land lease agreement, business license, business license, monitoring report, process flow chart, project approval. Sensitive points, industrial policies, pollution sources (emissions, effective measures). The equipment in the measures must be standardized (specification, model, quantity, source).
3. Engineering analysis, source strength, main impact analysis, etc. The process flow chart must have, and there must also be pollution producing nodes (pollution producing in each stage of the process) in the middle, and the pollution producing node table (as far as possible) - brief description (qualitative).
4. Impact prediction: predict the impact on the environment according to the existing data and the project construction content. Total amount control (SO2, COD, NH3-N). Note that the total amount control must be described in detail. Gansu Environmental Impact Assessment Report
5. Put forward mitigation measures for environmental impact. Briefly describe the construction period. During the operation period, there should be three simultaneities and environmental protection investment forms for the main pollutant sources, emissions and measures (factories, residents and sensitive points) of the project.
6. The whole report needs to be clear about the primary and secondary. If water is the key point of evaluation, it should be explained thoroughly.
In short, we should have a clear hierarchy and highlight the key points.