Welcome to the official website of Lanzhou Zhiyuan Engineering Project Management Service Co., Ltd! Main business of the company: Lanzhou Feasibility Study ReportLanzhou Environmental Impact Assessment ReportGansu Project Energy Saving Report Writing

National free consultation hotline

eighteen billion nine hundred and ninety-three million fifty-two thousand one hundred and ninety-eight

thirteen billion nine hundred and ninety-one million eight hundred and sixty-one thousand five hundred and thirty-eight

 Lanzhou Feasibility Study Report

contact us

Company name: Lanzhou Zhiyuan Engineering Project Management Service Co., Ltd

Contact: Manager Wang

Tel.: 18993052198

Fax: 0931-4648738

Email: [email protected]

Address: 15/F, Hongye Building, No. 91 Qingyang Road, Chengguan District, Lanzhou City, Gansu Province (Jingning Road and Qingyang Road Shizi)

website: coursescloud.cn

The four tables mentioned in the contents of Lanzhou Environmental Impact Assessment Report

Your current location: home page >> News Center >> Industry News

The four tables mentioned in the contents of Lanzhou Environmental Impact Assessment Report

Date of issue: 2022-06-09 Author: Lanzhou Zhiyuan Click:

1. Project Composition Table

(1) In combination with the project layout plan and project implementation content, it is classified by main works, auxiliary and public works, storage and transportation works, office and living;

(2) The construction content of each sub item of the project shall be listed in detail in the project composition table, and its scale or capacity shall be defined as far as possible;

(3) According to the construction period, operation period and even abandonment period, the environmental problems caused by each sub item of the project shall be analyzed in detail, and the types of waste water (liquid) and waste gas shall be described as far as possible;

(4) If possible, the proposed pollution control measures can be given in the project composition table;

(5) For reconstruction and expansion projects, it is necessary to identify which facilities are newly built, which are used, and which are reconstructed and expanded. Lanzhou Environmental Impact Assessment Report

2. Consumption of raw and auxiliary materials (including energy consumption)

(1) The name, specification, consumption and source of raw and auxiliary materials shall be stated;

(2) For hazardous chemicals, toxic and harmful substances, their physical and chemical properties shall be introduced; Coal composition shall be given when using coal.

3. List of Project Environmental Protection Measures and Investment Estimate

(1) Explain the location of pollutants, types of pollutants, disposal measures to be taken, and investment budget of each disposal measure;

(2) It shall include the costs for purchasing environmental protection instruments and equipment, standardizing sewage outlets, online monitoring, greening, and ecological restoration measures in other places;

(3) Resettlement and resettlement fees shall be listed separately (not included in the funds for environmental protection measures);

(4) It shall be noted in the list which environmental protection measures are to take the old with the new.

 Lanzhou Environmental Impact Assessment Report

4. Statistical Table of "Three Wastes" Discharge of the Project

(1) . Give a comparison of pollutant emissions before and after the treatment measures are taken for wastewater, waste gas and waste residue of the project. The table contains the concentration and output of pollutants before treatment, the concentration and emission of pollutants after treatment, the reduction amount and the treatment efficiency;

(2) The reconstruction and expansion project should give "three accounts", namely: first, the existing emissions; Second, emissions from reconstruction and expansion projects; Third, the change of emissions of the whole plant after the implementation of the reconstruction and expansion project (including total emissions, increase and decrease, increase and decrease rate).


Website: //coursescloud.cn/news/580.html

key word: Preparation of Lanzhou Environmental Impact Assessment Report , Preparation of Gansu Environmental Impact Assessment Report , Lanzhou EIA report writing

Recent browsing:

Lanzhou Zhiyuan Engineering Project Management Service Co., Ltd

 image.png Address: 15/F, Hongye Building, No. 91 Qingyang Road, Chengguan District, Lanzhou City, Gansu Province (Jingning Road and Qingyang Road Shizi)
 image.png Tel: 18993052198; 0931-4648738
 image.png Email: [email protected]


 Lanzhou Project Appraisal Consultation Gansu Feasibility Study Report
We can contact with each other in wechat Follow the official account


full name
Telephone
mailbox
content
Hot products |Main business area: Gansu Lanzhou Jiayuguan Jinchang Wu Wei Jiuquan Zhangye silver Pingliang Qingyang
  • Online Service
  • contact number
    eighteen billion nine hundred and ninety-three million fifty-two thousand one hundred and ninety-eight
  • Online Message
  • Online consultation
    Welcome to leave us a message
    Please enter your message here, and we will contact you as soon as possible.
    full name
    contacts
    Telephone
    Landline/mobile number
    mailbox
    mailbox
    address
    address